How different is cost engineering in North America?
Does the practice of cost engineering in the US and Canada differ significantly from the way it’s done in Europe, Asia, or the Middle East? As in, how different would the work be if one were a cost engineer in the US vs the UAE? Would someone with experience in the UAE and Pakistan be totally at sea in the US setting?
Observing members:
0
Composing members: 0
Composing members: 0